
Description
NEW CONSTRUCTION by long-time Bellaire builder - GREGORY HOMES. Stucco/Stone exterior with double entry doors opening into a versatile floor plan. Spacious kitchen with large quartz island, floor to ceiling cabinets, undercounter lighting and upgraded appliance package. Kitchen opens to great room and family dining. The large great room includes direct vent gas fireplace flanked by built-in cabinets and opens to large covered patio. First floor also features beautiful wood flooring, an extra bedroom/ensuite bath as well as a study/bedroom. Second floor features the primary bedroom and gorgeous tiled bathroom with dual sinks, stand alone tub, and 2 spacious closets. Two additional bedrooms, game room and media room with snack bar also up. Quality amenities include hardwood flooring, alarm system, yard sprinklers, tankless water heater, two 16 seer A/C systems, recess lighting, and ROOM FOR A POOL! Buyer selections available during construction process. Est completion date April 2024
-
4BEDS
-
0.15ACRES
-
4BATHS
-
01/2 BATHS
-
3,887SQFT
-
$382$/SQFT
School Information
Description
NEW CONSTRUCTION by long-time Bellaire builder - GREGORY HOMES. Stucco/Stone exterior with double entry doors opening into a versatile floor plan. Spacious kitchen with large quartz island, floor to ceiling cabinets, undercounter lighting and upgraded appliance package. Kitchen opens to great room and family dining. The large great room includes direct vent gas fireplace flanked by built-in cabinets and opens to large covered patio. First floor also features beautiful wood flooring, an extra bedroom/ensuite bath as well as a study/bedroom. Second floor features the primary bedroom and gorgeous tiled bathroom with dual sinks, stand alone tub, and 2 spacious closets. Two additional bedrooms, game room and media room with snack bar also up. Quality amenities include hardwood flooring, alarm system, yard sprinklers, tankless water heater, two 16 seer A/C systems, recess lighting, and ROOM FOR A POOL! Buyer selections available during construction process. Est completion date April 2024